Transaction value rejection requires reliable corroboration; refundable VAT is excluded and temporary registration does not defeat new-vehicle exempti...
Page of 4803
Press 'Enter' after typing page number.
381 to 400 of 96047 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
Valuation - manufacturing / construction at site - pre-fabricated canopies supplied by the appellant to oil companies - the primary activity is of manufacturing and fabrication and then only goods are being taken for assembly, erection or commissioning at a given petrol pump - By no stretch of imagination, the benefit of Notification No. 12/2012-CE can be extended to a manufacturing activity which is being undertaken at a factory and thereafter the fully manufactured pre-fabricated structures are taken in the form of the CKD/SKD condition for installation at the given site.
Valuation - manufacturing / construction at site - pre-fabricated canopies supplied by the appellant to oil companies - the primary activity is of manufacturing and fabrication and then only goods are being taken for assembly, erection or commissioning at a given petrol pump - By no stretch of imagination, the benefit of Notification No. 12/2012-CE can be extended to a manufacturing activity which is being undertaken at a factory and thereafter the fully manufactured pre-fabricated structures are taken in the form of the CKD/SKD condition for installation at the given site.
Note: It is a system-generated summary and is for quick reference only.