System-based e-scheduling for cargo examination streamlines import clearances through ICEGATE with automated notifications and controlled rescheduling...
Supply of solar inverter, controller, battery and panels would covered under “Solar Power Generating System” as a whole in terms of serial no. 234 of Schedule-I of the Notification No. 01/2017 -Central Tax (Rate) - applicable rate of GST on such supply will be 5% IGST [2.5% CGST + 2.5% SGST]
Supply of solar inverter, controller, battery and panels would covered under “Solar Power Generating System” as a whole in terms of serial no. 234 of Schedule-I of the Notification No. 01/2017 -Central Tax (Rate) - applicable rate of GST on such supply will be 5% IGST [2.5% CGST + 2.5% SGST]
Note: It is a system-generated summary and is for quick reference only.