Clean slate principle extinguishes uncrystallised operational claims and bars continuation of pending recovery and arbitral proceedings after plan app...
Works contract classification governs composite layout-development contracts where VAT-paid goods are transferred alongside construction and infrastru...
Specified income tax exemption for pollution control body remains conditional on non-commercial activity, unchanged income character, and return filin...
Jurisdictional facts in certificate-of-origin discrepancies can support customs show-cause proceedings, leaving factual explanations for departmental ...
Rule 12(4) of the capacity-based cess scheme for pan masala packing machines is described as valid because the Cess Act, Rule 12 and Schedule II operate as an integrated framework. Monthly cess is computed by reference to the maximum number of installed operational machines during the month, with capacity determined by rated speed and packing weight rather than installation date. The rule was found consistent with the parent statute and constitutional guarantees under Articles 14 and 19(1)(g). Abatement applies only where a machine remains continuously inoperative for at least fifteen days; machines installed later and subsequently operated cannot be treated as inoperative before installation. The reported writ petition was dismissed, subject to the statutory appellate remedy for the abatement rejection.
Rule 12(4) of the capacity-based cess scheme for pan masala packing machines is described as valid because the Cess Act, Rule 12 and Schedule II operate as an integrated framework. Monthly cess is computed by reference to the maximum number of installed operational machines during the month, with capacity determined by rated speed and packing weight rather than installation date. The rule was found consistent with the parent statute and constitutional guarantees under Articles 14 and 19(1)(g). Abatement applies only where a machine remains continuously inoperative for at least fifteen days; machines installed later and subsequently operated cannot be treated as inoperative before installation. The reported writ petition was dismissed, subject to the statutory appellate remedy for the abatement rejection.
Note: It is a system-generated summary and is for quick reference only.