Mis-declaration and Concealment: confiscation affirmed, transaction value re-determined and mandatory penalty sustained; redemption allowed on payment...
Infrastructure facility: energy-efficient public lighting held integral to road projects, qualifying the operator as a developer and eligible for dedu...
Fourth Proviso to Section 153A: extended-period inquiry requires a reasonable, material-based satisfaction that escaped income likely exceeds the thre...
Retention of seized cash and vehicles during pending PMLA proceedings was upheld where a prosecution complaint was already pending in the same ECIR, and Section 8(3)(a) was held not to require a fresh complaint for each later seizure. The Tribunal also held that retention is not limited to property of named accused persons, so the challenge based on one appellant not being named failed. It accepted continued retention to trace a larger suspected quantum of proceeds of crime, rejected the objection that a separate Section 20 order was necessary, and found prima facie reasons to believe on the material and an insufficient explanation of the asset source. The appeals were dismissed.
Retention of seized cash and vehicles during pending PMLA proceedings was upheld where a prosecution complaint was already pending in the same ECIR, and Section 8(3)(a) was held not to require a fresh complaint for each later seizure. The Tribunal also held that retention is not limited to property of named accused persons, so the challenge based on one appellant not being named failed. It accepted continued retention to trace a larger suspected quantum of proceeds of crime, rejected the objection that a separate Section 20 order was necessary, and found prima facie reasons to believe on the material and an insufficient explanation of the asset source. The appeals were dismissed.