Preliminary reassessment proceedings generally require statutory remedies unless jurisdiction is wholly absent or mandatory conditions are patently br...
Agricultural land classification requires cumulative factual indicators, while industrial-purpose land and absent agricultural use defeat reinvestment...
Solar inverters supplied for use in solar power generating systems were treated as integral parts of that system and, on the material produced, fell within Sl. No. 234 of Notification No. 1/2017-CT(R), attracting GST at 5%. The Court held that the concession extends to parts used for manufacture of solar power generating systems, and that assembling such parts into a new product with a distinct name, character and use satisfies the definition of manufacture. It also held that expressions such as "required to manufacture" and "for use" refer to intended use, so proof of actual end-use was not necessary. The contrary orders were quashed to that extent.
Solar inverters supplied for use in solar power generating systems were treated as integral parts of that system and, on the material produced, fell within Sl. No. 234 of Notification No. 1/2017-CT(R), attracting GST at 5%. The Court held that the concession extends to parts used for manufacture of solar power generating systems, and that assembling such parts into a new product with a distinct name, character and use satisfies the definition of manufacture. It also held that expressions such as "required to manufacture" and "for use" refer to intended use, so proof of actual end-use was not necessary. The contrary orders were quashed to that extent.
Note: It is a system-generated summary and is for quick reference only.