Condonation of Delay: Tribunal directed condonation where rectification proceedings were pursued, ordering merits adjudication after opportunity to be...
Page of 4813
Press 'Enter' after typing page number.
5401 to 5420 of 96257 Results
❮
❯
❯❯
0 / 200
Expand Note
Add to Folder
No Folders have been created
+
Are you sure you want to delete "My most important" ?
Solar inverters supplied for use in solar power generating systems were treated as integral parts of that system and, on the material produced, fell within Sl. No. 234 of Notification No. 1/2017-CT(R), attracting GST at 5%. The Court held that the concession extends to parts used for manufacture of solar power generating systems, and that assembling such parts into a new product with a distinct name, character and use satisfies the definition of manufacture. It also held that expressions such as "required to manufacture" and "for use" refer to intended use, so proof of actual end-use was not necessary. The contrary orders were quashed to that extent.
Solar inverters supplied for use in solar power generating systems were treated as integral parts of that system and, on the material produced, fell within Sl. No. 234 of Notification No. 1/2017-CT(R), attracting GST at 5%. The Court held that the concession extends to parts used for manufacture of solar power generating systems, and that assembling such parts into a new product with a distinct name, character and use satisfies the definition of manufacture. It also held that expressions such as "required to manufacture" and "for use" refer to intended use, so proof of actual end-use was not necessary. The contrary orders were quashed to that extent.
Note: It is a system-generated summary and is for quick reference only.