Cabinet okays widening of Kaliabor-Numaligarh section of NH-715 to 4-lane highway
X X X X Extracts X X X X
X X X X Extracts X X X X
....abinet okays widening of Kaliabor-Numaligarh section of NH-715 to 4-lane highway<BR>PTI News<BR>Dated:- 1-10-2025<BR>PTI<BR>New Delhi, Oct 1 (PTI) The Cabinet on Wednesday approved widening of Kaliabor-Numaligarh section of NH-715 in Assam at a total capital cost of Rs 6,957 crore. According to an official statement, the project will be developed on engineering, procurement and construction (EPC....
X X X X Extracts X X X X
X X X X Extracts X X X X
....) mode with a total length of 85.675 km and total capital cost of Rs 6,957 crore. The project also includes implementation of wildlife-friendly measures proposed on the Kaziranga National Park (KNP) stretch. The existing Kaliabor-Numaligarh section of NH-715 (old NH-37) has a configuration of two-lane passing through densely built Jakhlabandha (Nagaon) and Bokakhat (Golaghat) towns, as per the....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... statement. A major part of the existing highway passes either through the Kaziranga National Park or along the southern boundary of the park, having restricted right of way (ROW) of 16-32 metres further aggravated by substantially poor geometrics. During monsoon, the area inside the park gets flooded, leading to the movement of wildlife from the park towards the elevated Karbi-Anglong hills b....
X X X X Extracts X X X X
X X X X Extracts X X X X
....y crossing the existing highway, the statement said. The heavy round-the-clock traffic on the highway results in frequent accidents and deaths of wild animals, it said. The project alignment integrates with two major National Highways (NH-127, NH-129) and one state highway (SH-35), providing seamless connectivity to key economic, social, and logistics nodes across Assam. PTI BKS TRB<BR> News -....
X X X X Extracts X X X X
X X X X Extracts X X X X
.... Press release - PIB....
TaxTMI
TaxTMI