Just a moment...

βœ•
Top
Help
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedbackβœ•

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
β•³
Add to...
You have not created any category. Kindly create one to bookmark this item!
βœ•
Create New Category
Hide
Title :
Description :
+ Post an Article
Post a New Article βœ•
Title :
0/200 char
Description :
Max 0 char
Category :
Co Author :

In case of Co-Author, You may provide Username as per TMI records

Delete Reply

Are you sure you want to delete your reply beginning with '' ?

Delete Issue

Are you sure you want to delete your Issue titled: '' ?

Articles

Back

All Articles

Advanced Search
Reset Filters
Search By:
Search by Text :
Press 'Enter' to add multiple search terms
Select Date:
FromTo
Category :
Sort By:
Relevance Date

🏭 Environmental Impact Assessment (EIA) of a Thermal Power Plant (TPP).

YAGAY andSUN
Legal Framework Demands Rigorous Environmental Impact Assessment for Thermal Power Projects to Ensure Sustainable Development and Ecological Protection Environmental Impact Assessment (EIA) for a Thermal Power Plant involves a comprehensive legal and scientific process to evaluate potential environmental, social, and economic impacts before project approval. The assessment follows Indian regulations, focusing on screening, baseline data collection, impact prediction, and developing environmental management plans. Key stages include public consultation, expert appraisal, and ongoing monitoring to mitigate ecological risks associated with power generation infrastructure. (AI Summary)

🏭 Environmental Impact Assessment (EIA) of a Thermal Power Plant (TPP).

Here’s a structured explanation of the Environmental Impact Assessment (EIA) of an Industrial Thermal Power Plant, in line with Indian regulations, especially the EIA Notification, 2006 (as amended) under the Environment (Protection) Act, 1986.

πŸ“˜ Definition:

EIA is a process to evaluate the environmental, social, and economic impacts of a proposed thermal power project before granting environmental clearance.

πŸ“‘ Legal Framework

  • Governed under the EIA Notification, 2006 (MoEFCC)
  • Thermal Power Plants (β‰₯20 MW) fall under Category A β†’ require clearance from the MoEFCC at the central level.
  • Projects <20 MW may be Category B β†’ assessed at the State Environment Impact Assessment Authority (SEIAA).

πŸ” Stages of EIA Process

1. Screening (Not needed for Category A)

Determines if a full EIA is required (for Category B projects).

2. Scoping

  • Terms of Reference (ToR) issued by MoEFCC or SEIAA.
  • Specifies the focus areas for detailed study: air, water, soil, biodiversity, etc.

3. Baseline Data Collection

  • Monitoring over a one-season period (excluding monsoon).
  • Parameters:
    • Air Quality (SOβ‚‚, NOx, PM10, PM2.5)
    • Water Quality (surface & groundwater)
    • Soil Quality
    • Noise levels
    • Ecology & Biodiversity
    • Socio-economic status
    • Land use and topography

4. Impact Prediction and Assessment

  • Air Pollution: Emissions of COβ‚‚, SOβ‚‚, NOx, particulate matter
  • Water Pollution: Thermal discharges, effluents
  • Solid Waste: Fly ash, bottom ash
  • Noise Pollution
  • Ecological impact: flora, fauna, habitat disturbance
  • Public health: respiratory ailments, waterborne diseases
  • Cumulative impacts: from nearby industries or power plants

5. Environmental Management Plan (EMP)

  • Mitigation measures for each identified impact
  • Examples:
    • ESPs to control air pollution
    • Effluent Treatment Plants (ETPs)
    • Ash management strategy
    • Green belt development
    • Waste heat recovery systems

6. Public Consultation

  • Public hearing conducted by SPCB in affected areas.
  • Concerns from local communities are documented and addressed.

7. Submission of EIA Report & Decision Making

  • Final EIA + EMP submitted to MoEFCC/SEIAA.
  • Appraisal by Expert Appraisal Committee (EAC).
  • Environmental Clearance (EC) granted/rejected with conditions.

πŸ”¬ Key Environmental Issues with Thermal Power Plants

Aspect

Impact

Air Quality

Emission of SOβ‚‚, NOx, PM β†’ respiratory diseases

Water Resources

Heavy water consumption, thermal pollution

Soil & Land

Ash disposal leads to land degradation

Biodiversity

Habitat loss, avian mortality

Climate

Large GHG emissions contributing to climate change

πŸ“¦ Post-Environmental Clearance Monitoring

  • Environmental Monitoring Plan must be in place.
  • Six-monthly compliance reports submitted to MoEFCC/Regional Office.
  • Online monitoring through PARIVESH portal.

βœ… Best Practices for Reducing Environmental Impact

  • Use of supercritical or ultra-supercritical technology
  • Installation of FGD (Flue Gas Desulfurization) units
  • Use of zero liquid discharge (ZLD) systems
  • Dry ash handling and full ash utilization
  • Afforestation and ecological restoration plans

Certainly! Here’s a comprehensive overview of Β a sample Environmental Impact Assessment (EIA) structure, a case study of an NTPC Thermal Power Plant, graphs/maps of baseline data, and a flowchart of the EIA process.

πŸ“„ Sample EIA Structure for a Thermal Power Plant

  1. Executive Summary
    • Project description
    • Key environmental impacts
    • Summary of mitigation measures
  2. Introduction
    • Project background
    • Objectives of the EIA
    • Scope and methodology
  3. Project Description
    • Location and layout
    • Technology and fuel type
    • Water and energy requirements
    • Waste management strategies
  4. Baseline Environmental Conditions
    • Air quality
    • Water quality
    • Soil and land use
    • Noise levels
    • Biodiversity and ecology
  5. Impact Assessment
    • Air emissions (SOβ‚‚, NOβ‚“, PM)
    • Water consumption and thermal discharge
    • Solid waste generation (fly ash, bottom ash)
    • Noise pollution
    • Ecological impacts (flora and fauna)
  6. Environmental Management Plan (EMP)
    • Mitigation measures
    • Monitoring and reporting protocols
    • Emergency preparedness plans
  7. Public Consultation
    • Stakeholder engagement process
    • Summary of concerns and responses
  8. Conclusion
    • Summary of findings
    • Recommendations for project approval

🏭 Case Study: NTPC Sipat Thermal Power Station

Overview

  • Location: Sipat, Bilaspur District, Chhattisgarh, India
  • Capacity: 2,980 MW (supercritical units)
  • Technology: Utilizes supercritical technology for enhanced efficiency
  • Environmental Initiatives:
    • ISO 50001:2018 certified for energy management
    • Implementation of Global Energy Management practices
    • Adoption of supercritical technology to reduce emissions and improve efficiency

Environmental Management

  • Air Quality: Equipped with Flue Gas Desulfurization (FGD) systems to control SOβ‚‚ emissions
  • Water Use: Closed-loop cooling systems to minimize water consumption
  • Waste Management: Comprehensive fly ash utilization strategies

πŸ“Š Baseline Data: Air Quality Monitoring

While specific graphs/maps are not available in the provided sources, typical baseline data for a thermal power plant EIA would include:

  • Air Quality Monitoring:
    • Parameters: SOβ‚‚, NOβ‚“, PM10, PM2.5
    • Monitoring locations: Upwind, downwind, and ambient areas
    • Frequency: Continuous monitoring with periodic reporting
  • Water Quality Monitoring:
    • Parameters: pH, temperature, dissolved oxygen, heavy metals
    • Sampling points: Intake and discharge points
    • Frequency: Monthly sampling and analysis
  • Noise Level Monitoring:
    • Parameters: Leq (Equivalent Continuous Noise Level)
    • Monitoring locations: Residential areas, plant boundary
    • Frequency: Day and night measurements
  • Ecological Surveys:
    • Flora and fauna inventory
    • Habitat assessment
    • Impact on local biodiversity

πŸ”„ EIA Process Flowchart

The EIA process typically follows these steps:

  1. Screening: Determine if EIA is required
  2. Scoping: Define the terms of reference for the EIA study
  3. Baseline Data Collection: Gather environmental data
  4. Impact Assessment: Evaluate potential environmental impacts
  5. Environmental Management Plan (EMP): Develop mitigation strategies
  6. Public Consultation: Engage with stakeholders
  7. EIA Report Preparation: Compile findings and recommendations
  8. Decision Making: Authorities review and grant approval or rejection

***

answers
Sort by
+ Add A New Reply
Hide
+ Add A New Reply
Hide
Recent Articles