Just a moment...

Top
Help
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

Seeks to notify special procedure to be followed by a registered person engaged in manufacturing of certain goods

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....tification shall furnish the details of packing machines being used for filling and packing of packages in FORM GST SRM-I, electronically on the common portal, within thirty days of coming into effect of this notification. (2) Any person intending to manufacture goods as mentioned in the Schedule to this notification, and who has been granted registration after the issuance of this notification, shall furnish the details of packing machines being used for filling and packing of packages in FORM GST SRM-I on the common portal, within fifteen days of grant of such registration. (3) The details of any additional filling and packing machine being installed at the registered place of business shall be furnished, electronically on the common portal, by the said registered person within twenty four hours of such installation in PART (B) of Table 6 of FORM GST SRM-I. (4) If any change is to be made in the declared capacity of the machines, the same shall be furnished, electronically on the common portal, by the said registered person within twenty four hours of such change in Table 6A of FORM GST SRM-I. (5) Upon furnishing of such details in FORM GST SRM-I, a unique registratio....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....a brand name 5. 2403 11 10 'Hookah' or 'gudaku' tobacco bearing a brand name 6. 2403 11 10 tobacco used for smoking 'hookah' or known as 'hookah' tobacco or 'gudaku' not bearing a brand name 7. 2403 11 90 Other water pipe smoking tobacco not bearing a brand name. 8. 2403 19 10 Smoking mixtures for pipes and cigarettes 9. 2403 19 90 Other smoking tobacco bearing a brand name 10. 2403 19 90 Other smoking tobacco not bearing a brand name 11. 2403 91 00 "Homogenised" or "reconstituted" tobacco, bearing a brand name 12. 2403 99 10 Chewing tobacco (without lime tube) 13. 2403 99 10 Chewing tobacco (with lime tube) 14. 2403 99 10 Filter khaini 15. 2403 99 20 Preparations containing chewing tobacco 16. 2403 99 30 Jarda scented tobacco 17. 2403 99 40 Snuff 18. 2403 99 50 Preparations containing snuff 19. 2403 99 60 Tobacco extracts and essence bearing a brand name 20. 2....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....                  Part (B) Newly Added                                           Weight of packages which can be packed on the machine (in grams). Packing capacity of each track (No. of  packages which can be packed for a particular weight  of package). Total packing capacity of  the machine for  a specific weight of package to  be packed. Electricity consumption capacity of the machine per  hour (KWH). Registration no. of the machine (to be autogenerated by the system). Working status (Y/N) (9) (10) (11) (8x10) (12) (13) (14)                       ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....4) (5) (6) (7)                               Address of place of installation. No.  of tracks. Weight of packages which can be packed on the machine (in grams). Packing capacity of each  track (No.  of packages which  can be  packed for  a particular weight  of package) Total packing capacity of  the machine for  a specific weight of package to  be packed. Date of disposal. Reason of disposal (Supplied/ Condemned). (8) (9) (10) (11) (12) (13) (14)                                         9. Product details. Sr. No. Brand name. P....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ked by the machine on the said track per hour for the particular weight of package declared in column 9. (11). Total packing capacity of the machine for a specific weight of package which can  be packed would be computed by System based on information provided in column 8,9 &10. (12). Electricity consumption capacity of the machine to be provided in KWH. (13). Unique registration no. of the machine would be generated by System after filing the form. Structure of the unique no. will be GSTIN followed by three digits. (14). Whether the machine is working or is at standby. Accordingly, Y or N to be selected from the drop down menu. 3. Table 6A: Amendment to the details of the machine already provided in Table 6 or amended thereafter to be provided. After entering registration number of the machine assigned by the System in column 12 of Table 6 , other details of the machine would be auto-populated. The same can be edited wherever required. Certificate of chartered engineer shall also be uploaded for the machines whose details have been amended if the particulars given in the certificate uploaded earlier undergoes any change and the details of the d....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ntity procured (Rs.). Quantity consumed. Closing balance. Waste generated. (6) (7) (8) (9) (10)                     9. Details of production Brand name. Machine registration number. Packing type. Quantity in grams in each package. HSN. (1) (2) (3) (4) (5)                     Total           Description of  the product. Number of packages packed. MRP per package packed. (Rs.) Total value (in MRP) of the packages packed by machine. (Rs.) (6) (7) (8) (9) (7x8)                         10. Power consumption Sr. No. Meter / DG set no. Initial meter reading  on first day of the month. Final meter reading  on the last day of the month. Consumption (KWH). (1) (2) (3) (4) (5) (A) Elec....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....t time. From next month onwards, the information will be auto-populated from the closing balance of the previous month. (6). Quantity procured during the month have to be reported. (7). Value of the quantity procured have to be provided. (8). Quantity consumed have to be reported. (9). Closing balance should be the sum of quantity reported in col. 5 & 6 reduced by quantity reported in col. 8 (5+6-8) (10). Waste generated, if any to be reported. 3. Table 9: Details of the products manufactured to be reported brand wise, machine wise and package wise. Column wise details of the information to be provided is given in the table below: Column no. Description     1. Brand reported in table 9 of Form GST SRM-I to be selected from drop down for reporting production during the tax period. 2. Registration number of the machine assigned by System to be reported. 3. Packing type viz. pouch, zipper etc. manufactured during the tax period to be reported. 4. Description of the packing (Quantity in grams in each pack) to be reported. 5. HSN, at 8 digit level, of the goods manufactured during the tax period....