Just a moment...

Top
Help
AI Drafter

Generate professional replies to Show Cause Notices, assessment orders, audit objections, and other legal communications using TaxTMI's AI Drafter.

Step 1 – Issue Identification & Review

The AI analyses your query, notice, order, or uploaded documents and identifies the key issues involved.

• Review the issues identified by the AI
• Add, edit, remove, or refine issues as required


Step 2 – Draft Generation

Once you approve the issues, the AI performs issue-wise legal research and prepares a structured draft response.

• Relevant statutory provisions
• Judicial precedents and Supreme Court, High Court and other citations
• Issue-wise legal analysis
• Practical arguments and supporting content
• Professionally structured draft ready for further review.

Try Now
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

65th Meeting of Network Planning Group under PM GatiShakti evaluates five infrastructure projects

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....5th Meeting of Network Planning Group under PM GatiShakti evaluates five infrastructure projects <br>News and Press Release<br>Dated:- 9-2-2024<br><BR>NPG assesses road, rail and urban transit projects The 65th meeting of Network Planning Group (NPG) was held in New Delhi, under the chairpersonship of Additional Secretary, Department for Promotion of Industry and Internal Trade (DPIIT), Sh. Rajee....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....v Singh Thakur to evaluate five road, rail and urban transit projects from Ministry of Road Transport and Highways (MoRTH), Ministry of Railways (MoR), and Ministry of Housing and Urban Affairs (MoHUA). The NPG examined the projects from the perspective of integrated planning based on the PM GatiShakti principles. The project details were examined based on the planning/mapping on PM GatiShakti Nat....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ional Master Plan (NMP). The key outcomes of the evaluation exercise were discussed with the objective of improving connectivity with various economic/Social nodes, and multi-modal infrastructure. The projects discussed are summarized below: 1. MoRTH: Highway projects in the Goa, Meghalaya and Assam The projects from MoRTH pertains to four laning of 45 kms stretch of NH-66 in the state of Goa an....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....d development cum upgradation of Mawlyngkhung - Panchgram road from 2-Lane to 4-lane in the state of Meghalaya and Assam including greenfield stretch of 118 kms and brownfield stretch of 43 kms. Both the projects will have wider economic impacts including reduction in logistics cost, reduction in traffic congestion, and increase in average speed of traffic. 2. MoR: Construction of Rail-Over-Rail ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....bulb line in Bihar Besides, a railways project for the construction of a bulb line at Nabinagar (Ankorha) of approx. 17.49 km in Aurangabad district of Bihar was examined. The construction of the ROR bulb line would result in grade separation of two railway lines leading to reduced detention of trains, decline in transit time, increase in logistics efficiency of coal movement to Nabinagar power p....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....lant in the vicinity, and enhanced section capacity utilization of main lines. 3. MoHUA: Urban metro transit projects in Bangalore and Delhi/NCR The two urban transit metro corridor projects from MoHUA were discussed including Rithala-Bawana-Narela-Kundli (Haryana) Metro Corridor of DMRC in the NCR region and Phase-3 of Bangalore Metro Rail Project of 44.65 Km with 2 corridors from JP Nagar to K....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....empapura along ORR and Hosahalli to Kadabagere along Magadi road. Both the projects will result in multi-modal integration of metro with bus and rail stations, decongestion of roads, travel time savings, fuel cost savings, reliable operation and performance, and reduction in vehicular emission and pollution. The NPG suggested the project proponents plan for adequate transition infrastructure where....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... inter-modal interface is involved. It was emphasized during the meeting that these projects will play a pivotal role in nation-building by integrating various modes of transport, offer substantial socio-economic benefits and will contribute to the overall development of the regions.<BR> News - Press release - PIB....