Loading...

Top
Help
×

By creating an account you can:

Logo TaxTMI
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters 0/2000
TMI Blog
Home / TMI Blogs / RSS

Formats for claiming duty drawback on all industry rates/fixation of drawback rates/refund of terminal excise duty - Foreign Trade Procedure (old)

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....ued for manufacture of (No. of Units @ of the Export product). *(Bill  of  materials should consist of raw materials and components going into the manufacture of export product and the actual packing materials used). Sl. No. Name of the Material/ component Quantity Technical characteristics Whether imported or indigenous U ....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

.... 2. Maintenance stores/materials such as lubricating oil, greases, fuel etc. which are employed to run the machinery and plant should be excluded.   3. The data for packing materials should be for the same unit quantity for which data for export product for raw materials and components have been given.    4.Only these raw materials/component....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....by an independent Chartered Engineer) : (a) The consumption of various materials shown in DBK-I has been examined by us and these are actually required and being consumed in the factory of production for manufacture of export product as  checked by us on verification of the production process and relevant technical and related documents. (b) The imported materials above show....