Just a moment...

Top
Help
AI OCR

Convert scanned orders, printed notices, PDFs and images into clean, searchable, editable text within seconds. Starting at 2 Credits/page

Try Now
×

By creating an account you can:

Logo TaxTMI
>
Call Us / Help / Feedback

Contact Us At :

E-mail: [email protected]

Call / WhatsApp at: +91 99117 96707

For more information, Check Contact Us

FAQs :

To know Frequently Asked Questions, Check FAQs

Most Asked Video Tutorials :

For more tutorials, Check Video Tutorials

Submit Feedback/Suggestion :

Email :
Please provide your email address so we can follow up on your feedback.
Category :
Description :
Min 15 characters0/2000
TMI Blog
Home / RSS

Notifies the various authorized operations to be used by the Board of Approval while approving authorized operations in the Special Economic Zones

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....zed operations in the Special Economic Zones. This list would be used by the Board of Approval for authorizing operations to be undertaken in a Special Economic Zone which alone would qualify for exemptions, concessions and drawback. (A) Information Technology/Information Technology Enabled Services, Bio-technology and Gems and Jewellery Special Economic Zone: (i) Roads with Street lighting, Signals and Signage (ii) Water treatment plant, water supply lines (dedicated lines upto source), sewage lines, storm water drains and water channels of appropriate capacity (iii) Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal, Sewage treatment plants (iv) Electrical, Gas and Petrol....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....om time to time. (B) Sector Specific Special Economic Zones (i) Roads with Street lighting, Signals and Signage. (ii) Water treatment plant, water supply lines, sewage lines, storm water drains and water channels of appropriate capacity (iii) Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal and Sewage treatment plants (iv) Electrical, Gas and Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc (v) Security offices and police posts at entry, exit and other points within and along the periphery of the site. (vi) Effluent treatment plant and pipelines and other infrastructure for Effluent treatment (vii) O....

X X   X X   Extracts   X X   X X

Full Text of the Document

X X   X X   Extracts   X X   X X

....es, sewage lines, storm water drains and water channels of appropriate capacity (iii) Sewage and garbage disposal plant, pipelines and other necessary infrastructure for sewage and garbage disposal and Sewage treatment plants (iv) Electrical, Gas & Petroleum Natural Gas Distribution Network including necessary substations of appropriate capacity, pipeline network etc (v) Security offices and police posts at entry, exit and other points within and along the periphery of the site. (vi) Effluent treatment plant and pipelines and other infrastructure for Effluent treatment (vii) Office space and/or Shopping arcade and/or Retail space and/or multiplexes (viii) Housing (ix) Hotel (x) Clinic and/or Medical Centers and/or Hospital (xi) Sch....