Consolidated list of default authorized operations which can be undertaken by the developer/ approved co-developer by default from the date of notification - Reg.
X X X X Extracts X X X X
X X X X Extracts X X X X
....ction) Udyog Bhawan, New Delhi Dated the 4th September, 2009 To All Zonal Development Commissioners SEZs/ Developers/Approved co-developers of the notified SEZs. Sub: Consolidated list of default authorized operations which can be undertaken by the developer/ approved co-developer by default from the date of notification - Reg. Dear Sir/Madam, In continuation of this Depart....
X X X X Extracts X X X X
X X X X Extracts X X X X
....aithfully, Sd/- (T. Srinidhi) Director Tel: 2306 3265 E-mail: [email protected] CC: DG, EPCES Annexure AUTHORIZED ACTIVITIES WHICH CAN BE UNDERTAKEN BY THE DEVELOPER/APPROVED CO-DEVELOER BY DEFAULT FROM THE DATE OF NOTIFICATION (A) FOR ALL TYPES OF SEZs 1. Roads with Street lighting, Signals and Signage 2. Water treatment plant, water supply lines (dedicated lines up to ....
X X X X Extracts X X X X
X X X X Extracts X X X X
....offices, police posts, etc, at entry, exit and other points within and along the periphery of the site. 13. Effluent treatment plant and pipelines and other Infrastructure for Effluent treatment 14. Common Data centre with inter-connectivity 15. Play ground 16. Bus bays 17. Wi Fi/Wi Max Services 18. Drip and Micro irrigation systems 19. Parking including Multi-level car parkin....
X X X X Extracts X X X X
X X X X Extracts X X X X
....at (A)] 1. Fire Station Buildings 2. Fire protection system with sprinklers, fire and smoke detectors 3. Access control and Monitoring system 4. First-Aid post or 20-beded Clinic/Poly clinic/Pharmacy/ Medical Center, one hospital (up to 50 bed) (in the non-processing area only) 5. One Primary School (in the non-processing area only). 6. Power (including power back up facilities) ....
TaxTMI