<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Pre-Shipment Inspection Certificates must be issued promptly, with limited transitional relief for system-blocked backlog certificates.</title>
    <link>https://www.taxtmi.com/highlights?id=103930</link>
    <description>Recognised pre-shipment inspection agencies may, during a one-time seven-day transitional period, issue backlog Pre-Shipment Inspection Certificates for inspections completed before 25 August 2026 where system restrictions prevented certificate issuance. Thereafter, each Pre-Shipment Inspection Certificate must be generated and issued within two days of inspection; the system permits issuance only within that period. Certificate uploads must be made from the same geographical location or country in which the inspection occurred. All other requirements governing the revised pre-shipment inspection agency and certificate process remain unchanged.</description>
    <language>en-us</language>
    <pubDate>Fri, 18 Sep 2026 17:49:54 +0530</pubDate>
    <lastBuildDate>Fri, 18 Sep 2026 17:49:54 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=924113" rel="self" type="application/rss+xml"/>
    <item>
      <title>Pre-Shipment Inspection Certificates must be issued promptly, with limited transitional relief for system-blocked backlog certificates.</title>
      <link>https://www.taxtmi.com/highlights?id=103930</link>
      <description>Recognised pre-shipment inspection agencies may, during a one-time seven-day transitional period, issue backlog Pre-Shipment Inspection Certificates for inspections completed before 25 August 2026 where system restrictions prevented certificate issuance. Thereafter, each Pre-Shipment Inspection Certificate must be generated and issued within two days of inspection; the system permits issuance only within that period. Certificate uploads must be made from the same geographical location or country in which the inspection occurred. All other requirements governing the revised pre-shipment inspection agency and certificate process remain unchanged.</description>
      <category>Highlights</category>
      <law>DGFT</law>
      <pubDate>Fri, 18 Sep 2026 17:49:54 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/highlights?id=103930</guid>
    </item>
  </channel>
</rss>