<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Cabinet approves development of 6 lane Greenfield Elevated Corridor &amp; Ramps/Loops &amp; Foot Over Bridge between National Highway-19 and Varanasi Ring Road in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.14447.64 Crore under NH(O)</title>
    <link>https://www.taxtmi.com/news?id=73838</link>
    <description>Development of a six-lane greenfield elevated connector corridor between National Highway-19 and the Varanasi Ring Road has been approved under the National Highways (Original) programme through the Hybrid Annuity Model. The access-controlled corridor includes elevated road infrastructure, bridges, loops, ramps, link roads and service roads, and is intended to divert through traffic from congested urban roads. Aligned with the PM Gati Shakti National Master Plan, it integrates road, rail, air and inland-water connectivity while improving access to logistics, religious, educational and cultural destinations.</description>
    <language>en-us</language>
    <pubDate>Wed, 15 Jul 2026 16:56:16 +0530</pubDate>
    <lastBuildDate>Wed, 15 Jul 2026 16:56:16 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=911843" rel="self" type="application/rss+xml"/>
    <item>
      <title>Cabinet approves development of 6 lane Greenfield Elevated Corridor &amp; Ramps/Loops &amp; Foot Over Bridge between National Highway-19 and Varanasi Ring Road in Uttar Pradesh on Hybrid Annuity Model at total Capital Cost of Rs.14447.64 Crore under NH(O)</title>
      <link>https://www.taxtmi.com/news?id=73838</link>
      <description>Development of a six-lane greenfield elevated connector corridor between National Highway-19 and the Varanasi Ring Road has been approved under the National Highways (Original) programme through the Hybrid Annuity Model. The access-controlled corridor includes elevated road infrastructure, bridges, loops, ramps, link roads and service roads, and is intended to divert through traffic from congested urban roads. Aligned with the PM Gati Shakti National Master Plan, it integrates road, rail, air and inland-water connectivity while improving access to logistics, religious, educational and cultural destinations.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Wed, 15 Jul 2026 16:56:16 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=73838</guid>
    </item>
  </channel>
</rss>