<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>109th Meeting of Network Planning Group under PM GatiShakti evaluates key Infrastructure projects - NPG evaluates projects from Ministry of Railways, Ministry of Housing and Urban Affairs &amp; Ministry of Civil Aviation.</title>
    <link>https://www.taxtmi.com/news?id=71275</link>
    <description>The Network Planning Group evaluated four projects for conformity with PM GatiShakti principles of integrated multimodal infrastructure, last mile connectivity and a Whole of Government approach. Two third line railway projects (Jalandhar Cantt-Jammu Tawi and Manikpur-Itarsi) aim to augment rail capacity, resilience and operational throughput on strategic corridors. A Greenfield airport at Doloo, Silchar is proposed to relieve airport capacity constraints and stimulate regional socio economic growth. A Surat Metro extension is proposed as a dedicated feeder link to the Mumbai-Ahmedabad HSR corridor to enable seamless last mile and modal integration.</description>
    <language>en-us</language>
    <pubDate>Wed, 25 Feb 2026 16:18:07 +0530</pubDate>
    <lastBuildDate>Wed, 25 Feb 2026 16:18:07 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=887929" rel="self" type="application/rss+xml"/>
    <item>
      <title>109th Meeting of Network Planning Group under PM GatiShakti evaluates key Infrastructure projects - NPG evaluates projects from Ministry of Railways, Ministry of Housing and Urban Affairs &amp; Ministry of Civil Aviation.</title>
      <link>https://www.taxtmi.com/news?id=71275</link>
      <description>The Network Planning Group evaluated four projects for conformity with PM GatiShakti principles of integrated multimodal infrastructure, last mile connectivity and a Whole of Government approach. Two third line railway projects (Jalandhar Cantt-Jammu Tawi and Manikpur-Itarsi) aim to augment rail capacity, resilience and operational throughput on strategic corridors. A Greenfield airport at Doloo, Silchar is proposed to relieve airport capacity constraints and stimulate regional socio economic growth. A Surat Metro extension is proposed as a dedicated feeder link to the Mumbai-Ahmedabad HSR corridor to enable seamless last mile and modal integration.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Wed, 25 Feb 2026 16:18:07 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=71275</guid>
    </item>
  </channel>
</rss>