<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Cabinet approves Rehabilitation and upgradation of Ghoti – Trimbak (Mokhada) – Jawhar – Manor – Palghar section of NH-160A to 2 Lane /4 Lane with paved shoulder configuration with a Total Length of 154.635 km and Total Capital Cost of Rs.3320.38 crore in Maharashtra</title>
    <link>https://www.taxtmi.com/news?id=71063</link>
    <description>Approval is granted for rehabilitation and upgradation of the Ghoti-Trimbak-Jawhar-Manor-Palghar section of NH-160A in Maharashtra on Engineering, Procurement and Construction (EPC) mode, covering 154.635 km with a Total Capital Cost of Rs.3320.38 crore. The project provides 2-lane or 4-lane configurations with paved shoulders according to traffic projections to relieve congestion, integrate with expressways and highways, connect multiple economic and logistics nodes under PM GatiShakti, and generate substantial direct and indirect employment.</description>
    <language>en-us</language>
    <pubDate>Mon, 16 Feb 2026 10:20:33 +0530</pubDate>
    <lastBuildDate>Mon, 16 Feb 2026 10:20:32 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=886573" rel="self" type="application/rss+xml"/>
    <item>
      <title>Cabinet approves Rehabilitation and upgradation of Ghoti – Trimbak (Mokhada) – Jawhar – Manor – Palghar section of NH-160A to 2 Lane /4 Lane with paved shoulder configuration with a Total Length of 154.635 km and Total Capital Cost of Rs.3320.38 crore in Maharashtra</title>
      <link>https://www.taxtmi.com/news?id=71063</link>
      <description>Approval is granted for rehabilitation and upgradation of the Ghoti-Trimbak-Jawhar-Manor-Palghar section of NH-160A in Maharashtra on Engineering, Procurement and Construction (EPC) mode, covering 154.635 km with a Total Capital Cost of Rs.3320.38 crore. The project provides 2-lane or 4-lane configurations with paved shoulders according to traffic projections to relieve congestion, integrate with expressways and highways, connect multiple economic and logistics nodes under PM GatiShakti, and generate substantial direct and indirect employment.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Mon, 16 Feb 2026 10:20:33 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=71063</guid>
    </item>
  </channel>
</rss>