<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Cabinet approves construction of Twin Tube TBM road Underwater tunnel 2 Lane each under River Brahmaputra along with provision of Railway infrastructure in one of the tubes, in Assam with total length of 33.7 Km</title>
    <link>https://www.taxtmi.com/news?id=71060</link>
    <description>Cabinet approved a 33.7 km 4 lane access controlled greenfield corridor between Gohpur (NH 15) and Numaligarh (NH 715) including a 15.79 km twin tube TBM underwater Road cum Rail tunnel with rail provision in one tube, implemented on an EPC basis. The scope covers civil works, land acquisition, short road and rail cut and cover sections, and integration with existing highways and railway sections to deliver multimodal connectivity to airports, inland waterways, railway stations and economic, social and tourist nodes, with estimated traffic and employment implications.</description>
    <language>en-us</language>
    <pubDate>Mon, 16 Feb 2026 10:03:43 +0530</pubDate>
    <lastBuildDate>Mon, 16 Feb 2026 10:11:00 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=886555" rel="self" type="application/rss+xml"/>
    <item>
      <title>Cabinet approves construction of Twin Tube TBM road Underwater tunnel 2 Lane each under River Brahmaputra along with provision of Railway infrastructure in one of the tubes, in Assam with total length of 33.7 Km</title>
      <link>https://www.taxtmi.com/news?id=71060</link>
      <description>Cabinet approved a 33.7 km 4 lane access controlled greenfield corridor between Gohpur (NH 15) and Numaligarh (NH 715) including a 15.79 km twin tube TBM underwater Road cum Rail tunnel with rail provision in one tube, implemented on an EPC basis. The scope covers civil works, land acquisition, short road and rail cut and cover sections, and integration with existing highways and railway sections to deliver multimodal connectivity to airports, inland waterways, railway stations and economic, social and tourist nodes, with estimated traffic and employment implications.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Mon, 16 Feb 2026 10:03:43 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=71060</guid>
    </item>
  </channel>
</rss>