<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>NHPC to begin commercial operation of 250 MW unit at Subansiri hydro project on Sunday</title>
    <link>https://www.taxtmi.com/news?id=69238</link>
    <description>NHPC declared commercial operation of Unit 3 (250 MW) of the 2,000 MW Subansiri Lower Hydroelectric Project from 00:00 hours on 01.02.2026 in an exchange filing. The unit is one of eight 250 MW units comprising the project, constructed at an estimated cost of around Rs 27,000 crore near North Lakhimpur on the Assam-Arunachal Pradesh border; the project is a run-of-river development with water storage on the Subansiri river.</description>
    <language>en-us</language>
    <pubDate>Fri, 30 Jan 2026 20:31:04 +0530</pubDate>
    <lastBuildDate>Fri, 30 Jan 2026 20:31:04 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=882491" rel="self" type="application/rss+xml"/>
    <item>
      <title>NHPC to begin commercial operation of 250 MW unit at Subansiri hydro project on Sunday</title>
      <link>https://www.taxtmi.com/news?id=69238</link>
      <description>NHPC declared commercial operation of Unit 3 (250 MW) of the 2,000 MW Subansiri Lower Hydroelectric Project from 00:00 hours on 01.02.2026 in an exchange filing. The unit is one of eight 250 MW units comprising the project, constructed at an estimated cost of around Rs 27,000 crore near North Lakhimpur on the Assam-Arunachal Pradesh border; the project is a run-of-river development with water storage on the Subansiri river.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Fri, 30 Jan 2026 20:31:04 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=69238</guid>
    </item>
  </channel>
</rss>