<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Bengal coal gasification project: Bids invited for key air separation unit facility</title>
    <link>https://www.taxtmi.com/news?id=68535</link>
    <description>Bids are invited for an Air Separation Unit on a Build, Own and Operate basis to provide continuous oxygen and nitrogen supply to the proposed coal to SNG complex implemented by a 51:49 joint venture; the plant is designed for 80,000 Nm3/hour SNG, with construction slated January 2027-August 2028 and commissioning in 2029-30, and an immediate bid deadline.</description>
    <language>en-us</language>
    <pubDate>Sun, 25 Jan 2026 18:01:03 +0530</pubDate>
    <lastBuildDate>Sun, 25 Jan 2026 18:01:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=881221" rel="self" type="application/rss+xml"/>
    <item>
      <title>Bengal coal gasification project: Bids invited for key air separation unit facility</title>
      <link>https://www.taxtmi.com/news?id=68535</link>
      <description>Bids are invited for an Air Separation Unit on a Build, Own and Operate basis to provide continuous oxygen and nitrogen supply to the proposed coal to SNG complex implemented by a 51:49 joint venture; the plant is designed for 80,000 Nm3/hour SNG, with construction slated January 2027-August 2028 and commissioning in 2029-30, and an immediate bid deadline.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Sun, 25 Jan 2026 18:01:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=68535</guid>
    </item>
  </channel>
</rss>