<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Cabinet approves construction of 6-lane Nashik-Solapur-Akkalkot corridor at Rs 19,142 cr</title>
    <link>https://www.taxtmi.com/news?id=66198</link>
    <description>The Union Cabinet approved a six-lane access-controlled greenfield Nashik-Solapur-Akkalkot corridor (374 km) at Rs 19,142 crore to be implemented on BOT (Toll) mode, designed with close tolling and 60 km/h average speeds (100 km/h design) to reduce travel time by about 17 hours and distance by 201 km while enhancing freight connectivity to key NICDC nodes and linking to major national corridors.</description>
    <language>en-us</language>
    <pubDate>Wed, 31 Dec 2025 16:01:03 +0530</pubDate>
    <lastBuildDate>Wed, 31 Dec 2025 16:01:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=875071" rel="self" type="application/rss+xml"/>
    <item>
      <title>Cabinet approves construction of 6-lane Nashik-Solapur-Akkalkot corridor at Rs 19,142 cr</title>
      <link>https://www.taxtmi.com/news?id=66198</link>
      <description>The Union Cabinet approved a six-lane access-controlled greenfield Nashik-Solapur-Akkalkot corridor (374 km) at Rs 19,142 crore to be implemented on BOT (Toll) mode, designed with close tolling and 60 km/h average speeds (100 km/h design) to reduce travel time by about 17 hours and distance by 201 km while enhancing freight connectivity to key NICDC nodes and linking to major national corridors.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Wed, 31 Dec 2025 16:01:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=66198</guid>
    </item>
  </channel>
</rss>