<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>NTPC announces commercial operations of Nokh, Khavda solar projects</title>
    <link>https://www.taxtmi.com/news?id=65019</link>
    <description>NTPC, via NTPC Renewable Energy Limited and NTPC Green Energy Limited, filed that 243.66 MW of Khavda I Solar PV (of 1,255 MW) and 78 MW of the 735 MW Nokh Solar PV Project commenced commercial operations w.e.f. December 17, 2025, with an additional 37.925 MW of a 300 MW Khavda component declared commercial under the 450 MW Hybrid Tranche V Project, and the filings update the group&#039;s installed and commercial capacity to exceed 85,540 MW.</description>
    <language>en-us</language>
    <pubDate>Wed, 17 Dec 2025 16:46:03 +0530</pubDate>
    <lastBuildDate>Wed, 17 Dec 2025 16:46:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=872229" rel="self" type="application/rss+xml"/>
    <item>
      <title>NTPC announces commercial operations of Nokh, Khavda solar projects</title>
      <link>https://www.taxtmi.com/news?id=65019</link>
      <description>NTPC, via NTPC Renewable Energy Limited and NTPC Green Energy Limited, filed that 243.66 MW of Khavda I Solar PV (of 1,255 MW) and 78 MW of the 735 MW Nokh Solar PV Project commenced commercial operations w.e.f. December 17, 2025, with an additional 37.925 MW of a 300 MW Khavda component declared commercial under the 450 MW Hybrid Tranche V Project, and the filings update the group&#039;s installed and commercial capacity to exceed 85,540 MW.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Wed, 17 Dec 2025 16:46:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=65019</guid>
    </item>
  </channel>
</rss>