<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Andhra approves Rs 4,000-crore ReNew Photovoltaics solar ingot, wafer facility</title>
    <link>https://www.taxtmi.com/news?id=63710</link>
    <description>The Andhra Pradesh State Investment Promotion Board approved a Rs 3,990-4,000 crore, 6 GW greenfield solar ingot and wafer manufacturing facility by ReNew Photovoltaics at Rambilli on a 140-acre site, backed by the central Production-Linked Incentive scheme; construction is to be completed by March 2026, commercial production is expected January 2028, with operational needs of 95 MW power, 10 MLD water, and creation of about 1,200 jobs.</description>
    <language>en-us</language>
    <pubDate>Fri, 05 Dec 2025 12:16:02 +0530</pubDate>
    <lastBuildDate>Fri, 05 Dec 2025 12:16:02 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=869470" rel="self" type="application/rss+xml"/>
    <item>
      <title>Andhra approves Rs 4,000-crore ReNew Photovoltaics solar ingot, wafer facility</title>
      <link>https://www.taxtmi.com/news?id=63710</link>
      <description>The Andhra Pradesh State Investment Promotion Board approved a Rs 3,990-4,000 crore, 6 GW greenfield solar ingot and wafer manufacturing facility by ReNew Photovoltaics at Rambilli on a 140-acre site, backed by the central Production-Linked Incentive scheme; construction is to be completed by March 2026, commercial production is expected January 2028, with operational needs of 95 MW power, 10 MLD water, and creation of about 1,200 jobs.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Fri, 05 Dec 2025 12:16:02 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=63710</guid>
    </item>
  </channel>
</rss>