<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Trying to complete Delhi-Mumbai Expressway as soon as possible: Gadkari</title>
    <link>https://www.taxtmi.com/news?id=62965</link>
    <description>The minister reviewed the 1,350 km eight lane Delhi-Mumbai Expressway project, stressing expedited completion by removing obstacles, applying advanced technology, and conducting thorough quality assurance; the corridor aims to cut travel time to around 12 hours, connect multiple states and economic centres, incorporate green cover, and support future electric vehicle operations to reduce logistics costs and boost exports and tourism.</description>
    <language>en-us</language>
    <pubDate>Thu, 27 Nov 2025 20:01:03 +0530</pubDate>
    <lastBuildDate>Thu, 27 Nov 2025 20:01:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=867742" rel="self" type="application/rss+xml"/>
    <item>
      <title>Trying to complete Delhi-Mumbai Expressway as soon as possible: Gadkari</title>
      <link>https://www.taxtmi.com/news?id=62965</link>
      <description>The minister reviewed the 1,350 km eight lane Delhi-Mumbai Expressway project, stressing expedited completion by removing obstacles, applying advanced technology, and conducting thorough quality assurance; the corridor aims to cut travel time to around 12 hours, connect multiple states and economic centres, incorporate green cover, and support future electric vehicle operations to reduce logistics costs and boost exports and tourism.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Thu, 27 Nov 2025 20:01:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=62965</guid>
    </item>
  </channel>
</rss>