<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Adani Power gets LoI to set up 2,400 MW coal-based power plant in Bihar at USD 3 bn investment</title>
    <link>https://www.taxtmi.com/news?id=51787</link>
    <description>LoI issued for a 2,400 MW greenfield coal based plant under the DBFOO model, to supply 2,274 MW to two distribution companies; developer was lowest bidder at the tendered supply price. Project comprises 3x800 MW ultra supercritical units with staged commissioning (first unit within 48 months, final within 60 months). Fuel will be supplied via allocated coal linkage under the SHAKTI policy, and LoA and PSA are to follow.</description>
    <language>en-us</language>
    <pubDate>Thu, 07 Aug 2025 10:46:03 +0530</pubDate>
    <lastBuildDate>Thu, 07 Aug 2025 10:46:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=841587" rel="self" type="application/rss+xml"/>
    <item>
      <title>Adani Power gets LoI to set up 2,400 MW coal-based power plant in Bihar at USD 3 bn investment</title>
      <link>https://www.taxtmi.com/news?id=51787</link>
      <description>LoI issued for a 2,400 MW greenfield coal based plant under the DBFOO model, to supply 2,274 MW to two distribution companies; developer was lowest bidder at the tendered supply price. Project comprises 3x800 MW ultra supercritical units with staged commissioning (first unit within 48 months, final within 60 months). Fuel will be supplied via allocated coal linkage under the SHAKTI policy, and LoA and PSA are to follow.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Thu, 07 Aug 2025 10:46:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=51787</guid>
    </item>
  </channel>
</rss>