<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Titagarh Rail Systems bags Rs 1,600-crore contract to supply 108 coaches to Mumbai Metro</title>
    <link>https://www.taxtmi.com/news?id=51462</link>
    <description>A letter of acceptance creates obligations to design, manufacture, supply, install, integrate, test and commission 108 metro coaches delivered as 18 six coach train sets, with the design build phase to be completed within a specified timeline, followed by a two year defect liability period and five years of comprehensive maintenance.</description>
    <language>en-us</language>
    <pubDate>Mon, 04 Aug 2025 16:31:04 +0530</pubDate>
    <lastBuildDate>Mon, 04 Aug 2025 16:31:04 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=840766" rel="self" type="application/rss+xml"/>
    <item>
      <title>Titagarh Rail Systems bags Rs 1,600-crore contract to supply 108 coaches to Mumbai Metro</title>
      <link>https://www.taxtmi.com/news?id=51462</link>
      <description>A letter of acceptance creates obligations to design, manufacture, supply, install, integrate, test and commission 108 metro coaches delivered as 18 six coach train sets, with the design build phase to be completed within a specified timeline, followed by a two year defect liability period and five years of comprehensive maintenance.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Mon, 04 Aug 2025 16:31:04 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=51462</guid>
    </item>
  </channel>
</rss>