<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>DGCA orders enhanced inspection of Air India&#039;s Boeing 787 Dreamliner fleet</title>
    <link>https://www.taxtmi.com/news?id=46538</link>
    <description>DGCA ordered immediate enhanced safety inspection and additional maintenance actions for Air India&#039;s GEnx-powered Boeing 787-8/9 fleet, to be coordinated with regional offices. Required measures include fuel parameter monitoring, cabin air compressor and electronic engine control system tests, engine actuator and oil system checks, hydraulic serviceability checks, and a review of take-off parameters. Flight control inspections must be added to transit inspections until further notice and power assurance checks performed within two weeks. Closure of maintenance actions for repetitive snags from the prior 15 days and submission of reports to the regulator are mandated.</description>
    <language>en-us</language>
    <pubDate>Fri, 13 Jun 2025 18:31:03 +0530</pubDate>
    <lastBuildDate>Fri, 13 Jun 2025 18:31:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=828967" rel="self" type="application/rss+xml"/>
    <item>
      <title>DGCA orders enhanced inspection of Air India&#039;s Boeing 787 Dreamliner fleet</title>
      <link>https://www.taxtmi.com/news?id=46538</link>
      <description>DGCA ordered immediate enhanced safety inspection and additional maintenance actions for Air India&#039;s GEnx-powered Boeing 787-8/9 fleet, to be coordinated with regional offices. Required measures include fuel parameter monitoring, cabin air compressor and electronic engine control system tests, engine actuator and oil system checks, hydraulic serviceability checks, and a review of take-off parameters. Flight control inspections must be added to transit inspections until further notice and power assurance checks performed within two weeks. Closure of maintenance actions for repetitive snags from the prior 15 days and submission of reports to the regulator are mandated.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Fri, 13 Jun 2025 18:31:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=46538</guid>
    </item>
  </channel>
</rss>