<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>92nd Meeting of Network Planning Group under PM GatiShakti evaluates key Infrastructure projects</title>
    <link>https://www.taxtmi.com/news?id=42403</link>
    <description>Under the PM GatiShakti National Master Plan, the Network Planning Group reviewed four transport projects to strengthen integrated multimodal infrastructure and last mile connectivity. The proposals comprise an elevated access controlled highway bypass at Rishikesh to decongest NH 34 and provide alternate routes; a fourth rail line on Bina-Itarsi to reduce transit time and increase sectional speed; 3rd/4th multi tracking on Kasara-Manmad to maintain ruling gradients and improve energy efficiency; and 3rd/4th lines between Bhusawal and Wardha with track, station, yard and signaling upgrades to decongest freight on a high density corridor.</description>
    <language>en-us</language>
    <pubDate>Wed, 30 Apr 2025 09:35:53 +0530</pubDate>
    <lastBuildDate>Wed, 30 Apr 2025 09:35:53 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=818382" rel="self" type="application/rss+xml"/>
    <item>
      <title>92nd Meeting of Network Planning Group under PM GatiShakti evaluates key Infrastructure projects</title>
      <link>https://www.taxtmi.com/news?id=42403</link>
      <description>Under the PM GatiShakti National Master Plan, the Network Planning Group reviewed four transport projects to strengthen integrated multimodal infrastructure and last mile connectivity. The proposals comprise an elevated access controlled highway bypass at Rishikesh to decongest NH 34 and provide alternate routes; a fourth rail line on Bina-Itarsi to reduce transit time and increase sectional speed; 3rd/4th multi tracking on Kasara-Manmad to maintain ruling gradients and improve energy efficiency; and 3rd/4th lines between Bhusawal and Wardha with track, station, yard and signaling upgrades to decongest freight on a high density corridor.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Wed, 30 Apr 2025 09:35:53 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=42403</guid>
    </item>
  </channel>
</rss>