<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>THDC India synchronises first unit of its 1,000-MW pumped storage project in pump condenser mode</title>
    <link>https://www.taxtmi.com/news?id=41921</link>
    <description>THDC India synchronised the first 250 MW unit of its 1,000 MW pumped storage project at Tehri to the national grid in pump condenser mode, using variable-speed technology; the project comprises four 250 MW units and will raise the Tehri hydro complex&#039;s installed capacity to 2,400 MW alongside the existing Tehri HPP and Koteshwar HEP.</description>
    <language>en-us</language>
    <pubDate>Thu, 24 Apr 2025 20:01:04 +0530</pubDate>
    <lastBuildDate>Thu, 24 Apr 2025 20:01:04 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=817030" rel="self" type="application/rss+xml"/>
    <item>
      <title>THDC India synchronises first unit of its 1,000-MW pumped storage project in pump condenser mode</title>
      <link>https://www.taxtmi.com/news?id=41921</link>
      <description>THDC India synchronised the first 250 MW unit of its 1,000 MW pumped storage project at Tehri to the national grid in pump condenser mode, using variable-speed technology; the project comprises four 250 MW units and will raise the Tehri hydro complex&#039;s installed capacity to 2,400 MW alongside the existing Tehri HPP and Koteshwar HEP.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Thu, 24 Apr 2025 20:01:04 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=41921</guid>
    </item>
  </channel>
</rss>