<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Vaishnaw witnesses breakthrough of country&#039;s longest rail tunnel in Uttarakhand</title>
    <link>https://www.taxtmi.com/news?id=41145</link>
    <description>Breakthrough of the 14.57 km tunnel on the Rishikesh-Karnaprayag rail link, executed by Rail Vikas Nigam Limited (a Ministry of Railways PSU) and contractor L&amp;T, employs single shield TBM technology with a parallel twin tunnel under construction; the work required substantial logistics and procurement of TBM components from port to site.</description>
    <language>en-us</language>
    <pubDate>Wed, 16 Apr 2025 18:46:03 +0530</pubDate>
    <lastBuildDate>Wed, 16 Apr 2025 18:46:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=815051" rel="self" type="application/rss+xml"/>
    <item>
      <title>Vaishnaw witnesses breakthrough of country&#039;s longest rail tunnel in Uttarakhand</title>
      <link>https://www.taxtmi.com/news?id=41145</link>
      <description>Breakthrough of the 14.57 km tunnel on the Rishikesh-Karnaprayag rail link, executed by Rail Vikas Nigam Limited (a Ministry of Railways PSU) and contractor L&amp;T, employs single shield TBM technology with a parallel twin tunnel under construction; the work required substantial logistics and procurement of TBM components from port to site.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Wed, 16 Apr 2025 18:46:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=41145</guid>
    </item>
  </channel>
</rss>