<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Tata Power gets nod to install 100-MW battery energy storage project in Mumbai</title>
    <link>https://www.taxtmi.com/news?id=39996</link>
    <description>MERC approval permits Tata Power to install a multi-site battery energy storage system, centrally controlled from its Power System Control Center, with planned integration into a Distributed Energy Resource Management System; the BESS will provide black start functionality, optimise reactive power management, improve peak demand efficiency, and strengthen resilience for critical infrastructure through load-centric deployment over a two-year programme.</description>
    <language>en-us</language>
    <pubDate>Mon, 07 Apr 2025 13:46:03 +0530</pubDate>
    <lastBuildDate>Mon, 07 Apr 2025 13:46:03 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=812322" rel="self" type="application/rss+xml"/>
    <item>
      <title>Tata Power gets nod to install 100-MW battery energy storage project in Mumbai</title>
      <link>https://www.taxtmi.com/news?id=39996</link>
      <description>MERC approval permits Tata Power to install a multi-site battery energy storage system, centrally controlled from its Power System Control Center, with planned integration into a Distributed Energy Resource Management System; the BESS will provide black start functionality, optimise reactive power management, improve peak demand efficiency, and strengthen resilience for critical infrastructure through load-centric deployment over a two-year programme.</description>
      <category>News</category>
      <law>-</law>
      <pubDate>Mon, 07 Apr 2025 13:46:03 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/news?id=39996</guid>
    </item>
  </channel>
</rss>