<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Guidelines for Business Continuity Plan (BCP) and Disaster Recovery (DR) of Market Infrastructure Institutions (MIIs)</title>
    <link>https://www.taxtmi.com/circulars?id=64735</link>
    <description>MIIs must maintain a Primary Data Centre, a geographically separated Disaster Recovery Site and a Near Site to ensure data and transaction integrity and zero data loss; staffing at DR locations must be trained to operate independently; an Incident and Response Team/ Crisis Management Team chaired by the MD or CTO must declare disasters and invoke BCP. Technical parity between sites, synchronous replication to NS, unannounced live trading tests, documented DR drills with root cause analysis, and Board approved BCP DR policies subject to periodic review and system audit are required, with prescribed RTO and RPO targets for critical systems.</description>
    <language>en-us</language>
    <pubDate>Mon, 22 Mar 2021 00:00:00 +0530</pubDate>
    <lastBuildDate>Mon, 22 Mar 2021 18:26:00 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=639555" rel="self" type="application/rss+xml"/>
    <item>
      <title>Guidelines for Business Continuity Plan (BCP) and Disaster Recovery (DR) of Market Infrastructure Institutions (MIIs)</title>
      <link>https://www.taxtmi.com/circulars?id=64735</link>
      <description>MIIs must maintain a Primary Data Centre, a geographically separated Disaster Recovery Site and a Near Site to ensure data and transaction integrity and zero data loss; staffing at DR locations must be trained to operate independently; an Incident and Response Team/ Crisis Management Team chaired by the MD or CTO must declare disasters and invoke BCP. Technical parity between sites, synchronous replication to NS, unannounced live trading tests, documented DR drills with root cause analysis, and Board approved BCP DR policies subject to periodic review and system audit are required, with prescribed RTO and RPO targets for critical systems.</description>
      <category>Circulars</category>
      <law>SEBI</law>
      <pubDate>Mon, 22 Mar 2021 00:00:00 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/circulars?id=64735</guid>
    </item>
  </channel>
</rss>