<?xml version="1.0" encoding="UTF-8"?>
<?xml-stylesheet type="text/xsl" href="https://www.taxtmi.com/rss_sitemap/rss_feed_blog.xsl?v=1750492856"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>For the purpose of Section 80IA(4)(iii) - Industrial Part of M/s. Annapurna Builders, Hyderabad notified</title>
    <link>https://www.taxtmi.com/notifications?id=5230</link>
    <description>Notification designates M/s. Annapurna Builders&#039; undertaking as an industrial park under Section 80-IA(4)(iii), subject to conditions requiring specified area allocation, a minimum number of industrial units, and minimum infrastructure and built-up investment thresholds. Infrastructure must include common roads, water, sewerage, effluent treatment, telecom and power provided on commercial terms. Tax benefits are available only after the minimum unit threshold is met and while the developer continues park operations. Approval may be invalidated for material misrepresentation, undisclosed changes to the project plan, duplicate location approvals, or non-compliance, and transfer of operation must be notified to the designated authority.</description>
    <language>en-us</language>
    <pubDate>Fri, 22 Dec 2006 00:00:00 +0530</pubDate>
    <lastBuildDate>Wed, 23 Jul 2008 12:22:00 +0530</lastBuildDate>
    <generator>TaxTMI RSS Generator</generator>
    <atom:link href="https://www.taxtmi.com/rss_feed_blog?id=271462" rel="self" type="application/rss+xml"/>
    <item>
      <title>For the purpose of Section 80IA(4)(iii) - Industrial Part of M/s. Annapurna Builders, Hyderabad notified</title>
      <link>https://www.taxtmi.com/notifications?id=5230</link>
      <description>Notification designates M/s. Annapurna Builders&#039; undertaking as an industrial park under Section 80-IA(4)(iii), subject to conditions requiring specified area allocation, a minimum number of industrial units, and minimum infrastructure and built-up investment thresholds. Infrastructure must include common roads, water, sewerage, effluent treatment, telecom and power provided on commercial terms. Tax benefits are available only after the minimum unit threshold is met and while the developer continues park operations. Approval may be invalidated for material misrepresentation, undisclosed changes to the project plan, duplicate location approvals, or non-compliance, and transfer of operation must be notified to the designated authority.</description>
      <category>Notifications</category>
      <law>Income Tax</law>
      <pubDate>Fri, 22 Dec 2006 00:00:00 +0530</pubDate>
      <guid isPermaLink="true">https://www.taxtmi.com/notifications?id=5230</guid>
    </item>
  </channel>
</rss>