Just a moment...
Press 'Enter' to add multiple search terms. Rules for Better Search
Use comma for multiple locations.
---------------- For section wise search only -----------------
Accuracy Level ~ 90%
Press 'Enter' after typing page number.
Press 'Enter' after typing page number.
No Folders have been created
Are you sure you want to delete "My most important" ?
NOTE:
Press 'Enter' after typing page number.
Press 'Enter' after typing page number.
Don't have an account? Register Here
Press 'Enter' after typing page number.
Issues: Whether imported circuit breakers and connected items were eligible for assessment under Heading 98.01 on the basis that they were required for the initial setting up or substantial expansion of a unit of a specified power project, and whether the substantial expansion had to be of the overall power distribution network or could be of individual sub-stations treated as units.
Analysis: Heading 98.01 applies to items required for the initial setting up of a unit or the substantial expansion of an existing unit of a specified power project. The relevant enquiry is therefore unit-specific and not confined to the overall network as a whole. A sub-station forms a unit of the power distribution project, and expansion at the sub-station level can satisfy the requirement if the increase is substantial, meaning more than 25%. On the facts shown by the sub-station-wise material, substantial expansion was established in respect of three identified sub-stations, and the number of breakers installed at those locations was ascertainable.
Conclusion: The goods installed at the three sub-stations satisfying the substantial expansion threshold qualified for assessment under Heading 98.01, but the remaining imported breakers did not.